Framed

FramedThe frames are an integral part of dory construction. Amberjack plans call for two frames, one at station #2 and the other at #4. We have added a third frame at station #6 for additional strength and for fastening a seat riser. This will allow the thwarts to positioned anywhere along the riser. We decided to laminate the frames, including knees, after reading of other builders having solid wood frames split when fastening the shearstrake. No doubt naturally-grown knees would solve that problem but the laminated frames should just as strong.

2" x 3/16" Douglas Fir strips ready for gluing

2″ x 3/16″ Douglas Fir strips ready for gluing

Clamping setup

Clamping setup

Frame patterns incorporating the knees

Frame patterns incorporating the knees

Each frame is cut down the centre to produce two identical halves

Each frame is cut down the centre to produce two identical halves

Completed set of frames for one boat

Completed set of frames for one boat

Advertisements